1 Fred & Brad working on the slide-off portion of the observatory. 2 Fred Cyrway's observatory is almost complete. The section on top rolls to the side. 3 Chris Ober is adding a roof extension for water runoff. 4 Bob Menius and David Herlinger starting work on their observatory. 5 With the slab poured, construction starts on the building. The sides are being built. 6 Sides starting to go up. 7 3 sides are done. 8 The roof is being built. 9 Building is complete with the rolloff roof. 10 Video taken during the building of Bob and Dave's observtory. 25 seconds long 11 Larry Mitchell's building to store his telescopes. 12 Ken Bryant's completed observatory. 13 Ken Bryant's observatory with the slab and pier poured, and the walls going up. 14 Phase 2 of Lauren Herrington's storage building is complete. 15 Phase 1 of the storage shed is complete, now Phase 2 is in progress. 16 The base "planted" in the ground. 17 The base for the building is being built. 18 Electricity is run to the pad. 19 The pad for Lauren Herrington Morgan is poured, waiting for it to dry. 20 2 weeks ago Craig Lamison was standing on his slab. Now he is standing IN his observatory. Tree Triming